
BEST Verified SAP E-S4HCON2023 Exam Questions (2024)
The Best Practice Test Preparation for the E-S4HCON2023 Certification Exam
NEW QUESTION # 39
You want to perform custom code check via ABAP test cockpit in preparation of your SAP S/4HANA conversion? What kind of SAP System can you use to generate the custom code migration worklist?
- A. A Standalone SAP system with ABAP 7.51 or above
- B. AA
- C. An SAP S4HANA 1709 sandbox system
Answer: A,C
NEW QUESTION # 40
Unicode migration ECC on MaxDB to HANA in scale out what should we consider.
- A. A
- B. DMO can only be run with systems NW740 or NW731
- C. Target DB size will increase temporarily
Answer: B,C
NEW QUESTION # 41
In ICNV. How database operations synchronized between the source and the target table?
- A. AA
- B. Deletes are directly executed in the target table by delete trigger.
Answer: B
NEW QUESTION # 42
You are starting an SAP S/4HANA Conversion. The scenario strategy Downtime Optimized Conversion (DoC) is NOT selectable.What could be the reason?
- A. The SAP S/4HANA Conversion is without DMO.
- B. The start release is too old for DOC.
- C. The source database is not supported
- D. The SAP S/4HANA Conversion includes a DMO.
Answer: C
NEW QUESTION # 43
During the configuration of the DMO for SUM, how does the tool behave if option "Do not compare table contents" is selected regarding table comparison?
Please choose the correct answer.
Response:
- A. It does NOT perform any table comparison.
- B. It performs a comparison on selected tables using check sum.
- C. It performs a comparison of all tables using check sum.
- D. It performs a comparison on all tables using row counts.
Answer: D
NEW QUESTION # 44
Which step can be optimized when you provide the MIGRATE_DT_DUR.XML file to SUM?
- A. Silent data migration (SDM)
- B. Shadow on target creation
- C. Downtime migration
- D. Downtime conversion
Answer: C
NEW QUESTION # 45
You are performing an SAP S/4HANA conversion. Which phases are executed during SUM technical downtime? Note: There are 2 correct answers to this question
- A. PARMVNT_UPG
- B. TABIM_SHADOW_*
- C. TABIMJJPG
- D. PARDIST_SHD
Answer: C
NEW QUESTION # 46
What is the different between the benchmaking and the repetition option of the Database Migration Option (DMO) of SUM?
- A. The repetition option allows you to repeat the complete migration
- B. The benchmaking option allows you to repeat the uptime migration
- C. The repetition option allows you to run the migration without a shadow system
- D. The benchmaking option allows you to migration a specified set of tables
Answer: D
NEW QUESTION # 47
You are upgrading a three-system landscape DEV - QAS - PRD. The upgrade project contains a Unicode conversion. You have already upgraded the DEV and the QAS system but not yet the PRD system. What do you need to consider? Please choose the correct answer.
- A. The transport between Unicode and non-Unicode systems is forbidden.
- B. The upgrade of the PRD must be finished before you start new development in the DEV.
- C. The upgrade of the PRD must be finished before you import any transports from the upgraded DEV system into the PRD.
- D. The transport domain of systems DEV and QAS must differ from the transport domain of system PRD.
Answer: C
NEW QUESTION # 48
You are running an SAP ECC system.
For which of the following activities does SUM allow you to use the near-Zero Downtime Maintenance (nZDM) capabilities?
Note There are 3 correct answers to this question
- A. Perform an SAP S/4 HANA conversion including DMO
- B. Perform an SAP S/4 HANA conversion without DMO
- C. Apply SAP support packages
- D. Upgrade the SAP system
- E. Use DMO for SUM
Answer: C,D,E
NEW QUESTION # 49
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC
6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:
- A. Perform the Unicode conversion before the upgrade to SAP ECC 6.08.
- B. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.
- C. Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU
&UC) procedure. - D. Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode Conversion (CU &UC) procedure.
Answer: A
NEW QUESTION # 50
In which part of an upgrade does SUM allow you to generate ABAP loads (SGEN)?
There are 2 correct answers to this question.
- A. Post-downtime
- B. During downtime
- C. During SPDD
- D. During uptime
Answer: A,D
NEW QUESTION # 51
You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction".
Where can you change this during the migration via the Utilities option of the SUM UI?
There are 2 correct answers to this question
Response:
- A. In SUM Phaselist
- B. In Process Control Center
- C. In SUM Parameters
- D. In DMO Migration Preparation
Answer: B,C
NEW QUESTION # 52
Which preparational steps must be performed for an SAP S/4HANA conversion?
There are 2 correct answers to this question.
Response:
- A. Uninstall industry extensions not supported by SAP S/4HANA
- B. Delete client 066 (Early Watch Client)
- C. Install add-on SAP Gateway 7.50
- D. Uninstall Fiori apps not released for SAP_UI 7.50
Answer: B,D
NEW QUESTION # 53
You are running an SAP ECC system with SAP_BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.
- A. Unicode conversion SAP S/4HANA conversion including database migration
- B. Unicode conversion Upgrade to SAP ECC with SAP_BASIS 750 including database migrationSAP S/4HANA conversion without database migration
- C. Unicode conversion SAP S/4HANA conversion without database migration Database migration
- D. SAP S/4HANA conversion including database migration and Unicode conversion
- E. Unicode conversion Database migration SAP S/4HANA conversion without database migration
Answer: A,B,E
NEW QUESTION # 54
What is the main purpose of performing benchmark runs for an SAP S/4HANA conversion?
- A. To optimize the conversion
- B. To optimize the migration
- C. To optimize the main import
- D. To optimize the activation
Answer: B
NEW QUESTION # 55
You downloaded content from the SAP note 1000009 ("ASU Toolbox 2008"). Which transaction needs to be executed to use that content in the ASU Toolbox?
Please choose the correct answer.
Response:
- A. /ASU/START (Start ASU Toolbox)
- B. /ASU/UPGRADE (Start ASU Toolbox in Upgrade Mode)
- C. /ASU/SHOW_NOTE (Show SAP Note via Web-Browser)
- D. /ASU/SSM (ASU Simple Schedule Manager)
Answer: A
NEW QUESTION # 56
You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step
"Configuration". For some software components you find entries in the "Calculated level" column.
What does the "Calculated level" indicate for those software components?
Please choose the correct answer.
Response:
- A. The SAP Support Packages contained in the upgrade media
- B. The SAP Support Packages that will be bound to the upgrade
- C. The SAP Support packages of the Support Package Stack, calculated by the Maintenance Planner
- D. The SAP Support Packages found in the download directory
Answer: D
NEW QUESTION # 57
The SUM procedure stops with an error during uptime. How can you identify the current phase, the one in which SUM encountered an error?
There are 2 correct answers to this question.
Response:
- A. Check the messages shown by the SUM UI
- B. Check the most recent entries shown in file sapevt.trc
- C. Check the most recent entries in SAPup.log
- D. Check the system log (transaction SM21) of the SAP system
Answer: A,C
NEW QUESTION # 58
......
E-S4HCON2023 Exam Dumps, Practice Test Questions BUNDLE PACK: https://certlibrary.itpassleader.com/SAP/E-S4HCON2023-dumps-pass-exam.html